Braubach

Rheinuferstraße, 56338 Braubach
Latitude/Lat: 50.272244
Longitude/Lon: 7.644098

At a glance

  • Shore side: right
  • River kilometer: 580.15
  • Length limit: 110m
  • Double occupancy : not allowed
  • Entrance height pontoon: 1.74m
  • Double pontoon: no
  • Jetty length: 21.3m
  • Locking system: no
  • Landing bridge with central handrail

Evasive maneuvers for KD liners

Water levels and availability - Koblenz gauging station

Braubach

High water: Gauge 5.20m
Mooring and mooring at the landing stage is not permitted at high water.

Low water*: nn

*These are empirical values - information without guarantee! As the river bed can change at any time due to current influences, the skipper is obliged to pay attention to the water depth for the approach and departure from the landing stage on his own responsibility or, if necessary, to refrain from mooring!

Locking periods

Rhine in Flames Koblenz, closed due to personal use

Winter: nn

Arrival / Access

The KD landing stage in Braubach is suitable for passengers with reduced mobility.

Your journey by train/public transport
  • Regional train VIAS station Braubach, approx. 10 minutes on foot
Your journey by car
  • The KD landing stage is located in the Rhine facilities. Parking is available along the city wall on the B42 and in special parking lots directly on the Rhine, approx. 200 m from the KD landing stage.
Travel information for coaches
  • Parking spaces for coaches are located approx. 150 m away.
Access road
  • Access to the landing bridge is only possible for loading and unloading.

Information for the captain

Drinking water supply
  • No drinking water available
Shore power or Powerlock station
  • No Powerlock available
Waste disposal
  • Booking possible via the portal (at least 24 hours before arrival)
Internet
  • Wifi spot: not available

Your contact persons